Delivered within an occupied downtown office tower, this corporate workplace renewal required careful integration of new mechanical, electrical, and structural systems with existing base-building infrastructure.
Tower Engineering worked closely with the architectural team and building management to resolve lighting, HVAC zoning, power distribution, and structural coordination early in design. When selective demolition revealed undocumented existing conditions, Tower responded with targeted field verification and rapid cross-discipline coordination to maintain schedule and cost certainty.
The result is a flexible, high-performance workplace that supports a range of work environments and enabled a smooth, on-time tenant move-in.