Tower Engineering
  • Home
  • About Us
  • Services
  • Our Projects
  • Contact Us
  • Careers

FastFrate – Logistics Facility

Designed to support FastFrate’s growing logistics operations, this new facility integrates cross-dock functions, final-mile distribution, and modern office space within a single, efficient hub.

Tower Engineering provided structural, mechanical, and electrical engineering services for the design-build project, supporting phased construction and the demolition of existing occupied buildings. The facility features heavy-duty foundations, high-capacity racking, dedicated systems for battery charging and vehicle exhaust, and fully coordinated electrical and life-safety systems—designed for flexibility, efficiency, and future growth.

Location:
Winnipeg
Share on:
Facebook Twitter

WINNIPEG

WINKLER

CALGARY

KELOWNA

© 2025 Tower Engineering Group. All Rights Reserved.
Certification Logo
  • Home
  • About Us
  • Services
  • Our Projects
  • Contact Us
  • Careers